Laserfiche WebLink
<br />Notes New Pryor Amer. Fuels - 3 - <br />NOV C-84-063 <br />- Issued 4/26/ 8 <br />- Failure to construct emergency spillway in <br />- Assessment conference 7/3/84, $700 total <br />- Abated 8/2/84 <br />- Penalty never paid <br />July 23, 1985 <br />sediment pond. <br />NOV C-84-067 <br />- Issued 5/3/84 <br />- Failure to pass all disturbed drainage through sediment pond <br />- Small area exemption for south end of the pit expired 4/30/84 <br />- Assessment conference 7/3/84, total $970 <br />- Submitted Technical Revision application 8/2/84 <br />- Never paid penalty <br />NOV C-84-157 <br />- Issued 9/7/84 <br />- Failure to maintain collection ditch below 0.6. stockpile <br />- No assessment conference requested <br />- Penalty fixed $235 <br />- Abated 11/6/84 <br />- Never paid penalty <br />C. Second pattern involves violations of performance bonding <br />requirements. <br />NOV C-84-176 <br />- Issued 12/18/84 <br />- Failure to submit bond for final approval of Technical Revision <br />$7,500. <br />- No assessment conference requested <br />- Penalty fixed at $950 <br />- Not abated. <br />- Never paid penalty <br />NOV C-84-177 <br />- Issued 12/18/84 <br />- Failure to submit bond for stream channel reconstruction plan, <br />Stip. No. 15, $9,000. <br />- No assessment conference requested <br />- Penalty fixed at $950 <br />- Not abated. <br />- Never paid penalty <br />