Laserfiche WebLink
<br />1 <br /> <br /> <br />' EBHIBIT E <br />The current reclamation plan will be followed in the amendment <br /> application for the Montoya Pit Amendment. Grading of the west <br />' side has bee n completed at a 2-1/2H:1V slope. The north highwall <br /> will be mine d to a 3H:1V slope. <br />' The operator is requesting a continuance for the east side <br /> reclamation as serious negotiations with the landowner to the <br /> east are in progress. Please see the enclosed letter from the <br />' real estate agent handling negotiations for this property. <br /> Criteria fo r reclamation of the amendment area has been <br /> established within the terms of the BLM contract. <br />' Due to the fact that mining the north headwall will reduce <br /> reclamation that needs to be done and the west side of the pit <br /> has already been graded at 2-1/2H:1V, it is anticipated overall <br />t reclamation financial warranty can be reduced. <br /> Topsoil is virtually non-existent in the amendment area. What <br /> little topso il there is will be stockpiled and re-spread over the <br /> newly mined 3H:1V slope in the amendment area. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />