Laserfiche WebLink
COLORADO DIVISION OF MINERALS AND GEOLOGY <br />PICKUP TRUCK COST DATA WORKSHEET Sheet 1 of 2 sheets <br />REVISION DATE: August. 1996 <br />WORKSHEET FILENAME: PIKUP-TK.WKI <br />MACHINE DESCRIPTION: PICKUP iRULK -GASOLINE. 4x4, J/4 TON. 130HP <br />COST ADJUSTMENT FACTORS <br />Acquisition Cost: <br />Economic Life Hours: <br />Annual Use Hours: <br />Mech. Labor Cost-Zone 1: <br />-Zane 2: <br />Fuel Cost per gal.: <br />Cube Cost: <br />Tire Life Hours: <br />Tire Purchase Price: <br />BASE VALUE ADJUSTED VALUE <br />518.210.00 513.522.38 <br />7000 9000 <br />2112 2000 <br />521.15 523.32 <br />521.15 523.32 <br />51.16 51.16 <br />50.40 50.40 <br />2000 1650 <br />5600.00 (456.75 <br />REFERENCES: 1) COST REFERENCE GUIDE <br />2) CONTRACTORS EpUIPMENT LOST GUIDE <br />3) COLORADO CONTRACTORS ASSOCIATION <br />WAGE RATE SCHEDULE <br /> ~ ~ --- BASE OWNERSHIP 6 OVERHAUL COSTS ----~ --••----- ------- BASE OPERATING COSTS --- -••---- <br />BAS[C MODEL 8 ATTACHHENTS ~ DESCRIPTION ~ DEPRECIATION OHD/LFC LABOR PARTS LA80R PARTS FUEL LURE TIRES G.E.C. <br />Machine Nodel No. :3/4 TON 4x4 PICKUP 52.04 50.63 50.35 50.47 50.44 50.40 52.87 50.40 50.30 50.00 <br />Attachment #1 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment #2 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment #3 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />BASE LOST SUB70TAL5 52.04 fD. 63 50.35 SD. 47 fD. 44 30.40 52.81 50.40 50.30 fO. OD <br /> ~ ~-• ADJUSTED OWNERSHIP 6 OVERHAUL COSTS •~ •-------- -- ADJUSTED OPERATING COSTS --- ------- <br />COST ADJUSTMENT FACTORS ~ FACTOR VALUE ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LURE TIRES G.E.C. <br />Acquisition Cast 0.7401 51.51 N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Economic Life 0.7778 51.11 N/A 50.27 50.37 50.34 50.31 N/A N/A N/A N/A <br />Annual Usage 1.0560 51.59 50.61 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts .750depr.-.SOOohd 51.20 50.33 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple Shifts .661depr.-.333ohd 51.06 50.22 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mechanic Cost Zone 1 0.8591 N/A N/A 50.23 N/A 30.29 N/A N/A N/A N/A N/A <br />- Zone 2 O.B591 N/A N/A 50.23 N/A 50.29 N/A N/A N/A N/A N/A <br />Fuel/Cube/Tire Cost Variable N/A N/A N/A N/A N/A N/A 52.81 50.40 50.36 50.00 <br />Truck Util. - Zone 1 100.00; N/A ~ N/A 50.23 50.31 50.29 50.31 52.87 50.40 50.36 50.00 <br />- Zane 2 100.00X N/A N/A 50.23 50.37 30.29 50.31 52.87 50.40 50.36 50.00 <br />ADJUSTED COST SUBTOTALS -S.SHIFT -ZONE A: 51.59 50.61 50.23 50.37 50.29 50.31 52.87 50.40 50.36 50.00 <br /> -ZONE B: 51.59 50.61 50.23 50.37 50.29 50.31 52.81 50.40 30.36 50.00 <br /> -D.SHIFTS-ZONE A: 51.20 50.33 50.23 50.37 50.29 50.31 52.87 50.40 30.76 30.00 <br /> -ZONE 8: 51.20 50.33 50.23 50.37 50.29 50.31 52.87 50.40 50.36 50.00 <br /> -T.SH[FTS-ZONE A: 51.06 50.22 50.23 50.37 50.29 50.31 52.87 50.40 50.36 50.00 <br /> -ZONE 8: 51.06 50.22 50.23 50.31 50.29 50.31 52.87 10.40 50.36 50.00 <br />