My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12493
DRMS
>
Back File Migration
>
Revision
>
REV12493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:28 AM
Creation date
11/21/2007 10:33:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/17/1993
Doc Name
ADEQUACY REVIEW FOR TR 65 WEST ELK MINE FN C-80-007
From
DMG
To
MTN COAL CO
Type & Sequence
TR65
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adequacy Letter - TR 65 <br />September 17, 1993 <br />BOND ESTIMATE <br />Page 6 <br />1. The following costs for these structures should be utilized: <br />A. Stacktube walls (concrete walls with heavy <br />reinforcement): $10.86/ft2 <br />B. Reclaim tunnel floors and roof: $9.03/ft2 <br />C. Reclaim tunnel walls (concrete walls with average <br />reinforcement): $9.95/ft2 <br />D. Inlet sediment traps walls: $9.95/ft2 <br />E. Weir box walls: $6.21/ft2 <br />2. MCC should include a cost for concrete removal for the dozer <br />trap/reclaim system as it appears from Drawing G-102 that the <br />conveyor proceeds below grade. <br />3. The Division has reviewed the amount of earthwork that is <br />required to reclaim MB-2, MB-3, and MB-6, and found that the <br />amount required is similar to earthwork that will be required <br />to reclaim MB-2R and enlarged MB-3. Therefore, these tasks do <br />not have to be re-estimated at this time. <br />4. The Division has the following culvert inventory based on <br />Drawings G-101, G-103, and G-104: <br />MB-2R: 24" CMP inlet (SW) 20 ft. long <br />24" CMP inlet (NE) 30 ft. long <br />48" CMP drop inlet 17. 7 ft . long <br />48" CMP outlet 320 ft. long <br />MB-3: 12" CMP outlet 180 ft. long <br />48" CMP drop inlet 66 ft. long <br />24" CMP inlet (SE) 34 ft. long <br />30" CMP inlet (S) 20 ft. long <br />Miscellaneous: <br />12" CMP under access rd. to weir box <br />24" CMP NW of MB-2R <br />6" PVC to intake gallery <br />TOTALS: 6" PVC 550 feet <br />12" CMP 200 feet <br />24" CMP 184 feet <br />30" CMP 20 feet <br />48" CMP 403.7 feet <br />22 ft. long <br />100 ft. long <br />550 ft. long <br />
The URL can be used to link to this page
Your browser does not support the video tag.