My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-08_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
2004-09-08_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:16 PM
Creation date
11/21/2007 10:29:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
9/8/2004
Doc Name
Mod.- Ground Water Monitoring Plan
From
American Soda LLP
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
location at Yankee Gulch and once per year for the domestic well located off site <br />from Yankee Gulch. These level measurements would be made in conjunction <br />with the water quality sample collection. No production solution mines would be <br />in operation and no brine solution would be circulating in the wells or the <br />pipelines. All stand-by status production wells that are not plugged and <br />abandoned would be at ambient temperature and pressure with cast-iron bridge <br />plugs set. The constituent list would include the twelve laboratory parameters <br />and four field measurements specified in the bottom portion of Table 3. <br />No water quality sampling will take place at well 20-4A in either the interim status <br />or commercial production monitoring plans. The well was a re-completed B <br />Groove monitoring well that shows elevated pH as a result of cement contact <br />through the perforation. Only water level data is of value ai this point. Well 19-3 <br />was drilled to detect leakage from an evaporation pond that was never <br />constructed. The well has never had sufficient water to collect a sample. The <br />well will be checked for water level during each sampling event and ii sufficient <br />water is present a sample will be collected. <br />Once commercial production operations resume, water levels will be monitored <br />continuously using water level probes at dissolution surface monitoring sites and <br />monthly with a manual measuring device at all other locations. Information <br />provided from the first five years of operation indicates that water level monitoring <br />is the best primary indicator of an influence from solution mining. Ground water <br />sampling would continue to take place on a quarterly frequency. The constituent <br />list in Table 4 summarizes the proposed commercial production monitoring <br />plan. All proposed laboratory and field constituents are the same for both the <br />interim status and commercial production time periods. <br />The contingency in both interim status and commercial production monitoring <br />plans would be to increase the frequency of monitoring in the event that the data <br />indicates it is necessary to do so to evaluate an occurrence outside of Permit <br />Condition Values. Permit Condition Values would include established Numeric <br />Protective Standards for applicable point of compliance wells and Early Warning <br />Indicators for all other wells with the exception of up-gradient or control wells. <br />During interim status, a verification sample would be collected in the month <br />following the second quarterly sample containing one or more indicator <br />parameters that are outside of Permit Condition Values. <br />Once commercial production resumes, a verification sample would be <br />collected in the month following the first sample containing one or more indicator <br />parameters that are outside of Permit Condition Values. Notification would be <br />made to the Drvisron of Minerals and Geology within 5 days of processing the <br />data reports from the lab for any constituents outside of the Permit Condition <br />Values regardless of the operational status of the project. If the first verification <br />sample also lies outside of the Permit Condition Values. a second verification <br />
The URL can be used to link to this page
Your browser does not support the video tag.