Laserfiche WebLink
Permit Revision No..3 <br />Fehrucrry 11, 1999 <br />Pnge 3 <br />existing permit boundary and the federal lease boundary". MCC is aware that a few of the <br />projected B-seam longwall panels are depicted to extend beyond the current lease and/or permit <br />boundaries. MCC intends to obtain all appropriate rights-to-enter and permits prior to mining <br />these particular panels. Also keep in mind that in the case of the southern-most Apache Rucks <br />panels, mining is not scheduled to begin until 2016. MCC will provide the Division with the <br />BLM approvals when they are received. <br />[n addition, enclosed with this response are additional changes to permit text, exhibits and maps. <br />These changes have occurted since the permit revision application was submitted to the Division <br />in February 1998. The enclosed documents include: <br />Exhibit 1: Revised Officers and Directors for MCC, L.L.C, Arch Coal, Inc., Ark Land <br />Company, Arch Western Acquisition Corporation, and Arch Western Resources, L.L.C. to <br />reflect the sale of MCC to Arch Coal, Inc. from ARCO. In addition, the list of Officers and <br />Directors of ARCO have been removed from Exhibit 1, as ARCO only retained aone-percent <br />interest in MCC afrer the sale; and, therefore, do not qualify as an Owner and Controller as <br />defined at 1.04(83a). A separate table includes the beginning and ending dates of the Officers <br />and Directors. <br />Exhibit 2: Revised Surface Owners, Mineral Owners, and Leasehold and Royalty Interests with <br />current information. The list of ROW Easements and Miscellaneous was removed from the <br />Exhibit because this list includes who has requested a ROW Easement from MCC and who has <br />grazing leases with MCC, which is not information required by the Regulations. <br />Map lA: Revised Permit Revision Area map. <br />M°n 2: Revised Surface Owner map to reflect current information. <br />Man 4: Revised Mineral Ownership and Leasehold map to reflect current information. <br />Man 51: Revised E-seam mine plan with current information. <br />Map 52: Revised B-seam mine plan with curtent information. [n addition, enclosed is a letter <br />from the Bureau of Land Management approving our revised mine plan. <br />Permit Pases: Revised various pages in Volume 1 of the permit. Only pages revised for this <br />response letter have been included. <br />