Laserfiche WebLink
(Deposition of James Tatum) <br />1 reach this side and I didn't want to do it that way <br />2 because we were going to have a right-of-way and an <br />3 easement and a power line that was much longer than <br />4 necessary to do this job. And I wasn't willing to <br />5 cough up as much of the property as they wanted to <br />6 do under his initial concept. <br />7 This went on for some period, <br />8 couple of months or so, while they negotiated or <br />9 talked to San Isabel -- what is the power company <br />10 here -- about an alternative method. They had <br />11 power coming up the railroad right-of-way or on the <br />12 south side of the valley that had, I guess, the <br />13 amperage and voltage requirement that they needed <br />14 for this thing but they didn't have it on the north <br />15 side of the highway so they had to jump across the <br />16 valley with a power line to get just to the site <br />17 that they needed or this side. <br />18 Ultimately it was decided that <br />19 they would come into it from the east and not have <br />20 to tear up as many trees and not have to do as much <br />21 destruction to the surface to get the power to the <br />22 place, so that became a more acceptable proposal to <br />23 us. <br />24 Q. where did the negotiations go from that <br />25 point? <br />38 <br />MEEK & ASSOCIATES <br />3016 3rd Ave., Pueblo, Co 81008 (719) 542-1010 <br />