Laserfiche WebLink
<br /> <br />Kent Gorham <br />December 17, 1999 <br />Page 2 <br /> <br />Comment: <br />C. A plan for repair of existing rills between the contour furrows. <br />Response: <br />The proposed design for furrow spacing provides a limited distance between furrows <br />that is intended to eliminate additional erosion in existing rills and allow these rills to <br />gradually stabilize. EFMC anticipates future maintenance of the furrows to ensure <br />erosion control. If it is determined that some rills are not stabilizing in the furrowed <br />azeas, EFMC will implement additional measures as proposed in the Rill and Gully <br />Control Plan contained in this minor revision. <br />Comment: <br />D. The work must be completed by December 31, 1999. Extension of work into 2000 will <br />re-initiate the liability period as per Rule 3.02.3, which means the re-disturbed site <br />would not be eligible for final bond release until 2010. <br />Response: <br />EFMC interprets, based on Rules 4.15.7(5) and 3.02.3, that the work must be <br />completed by November 2000 (5 yeazs from initial planting). <br />Comment: <br />E. If EFMC proposes to add fertilizer in the inter-seeded areas, the fertili~r rate is <br />required. <br />Response: <br />EFMC proposes application of fertilizer at 150 Ib. per acre on the reseeded azeas. <br />This rate is shown on the revised Reclamation Timetable, included with these <br />responses for placement in the permit application. <br />This amended minor revision package includes (3) three copies of the following: <br />Summary of Revisions and Additions <br />Revised Permit Text/ Maps <br />zo <br />Zo <br />IU <br />- -~ <br />""<~rQ <br />IS ~, tS <br />-~.e cS <br />!~ // <br />vz y ! bt N 7~6~..., <br />~ y /~S ~~ <br />l Z l bs <br />k <br />16~ 16S l6r <br />yD _~- fro ~-~-~. <br />