Laserfiche WebLink
<br /> <br />SYNOPSIS OF EVENTS <br />DATE DESCRIPTION <br />4-20-93 Division inspection - no engineering proposals received by <br /> the Division. <br /> West Wall - Some additional grading is still required before the <br /> elopes can be seeded. The south and east sides will be graded back <br /> and smoothed out. A berm will be placed along the boundary of the <br /> two slopes. Angled channels will be cut in the slopes to break up the <br /> slope and minimize erosion energy. <br /> East Wall - Tension cracks and slump blocks continue to move. <br /> Operator ie awaiting Jefferson County approval to remine the east <br /> wall. <br /> General - Mining is occurring on roughly 50' benches on the south end <br /> of the Central Quarry. This does not conform to either AM No. 1 or <br /> AM No. 2 mining plans. The Division set 6-30-93 as the deadline for <br /> amendment submittal to clarify both the mining and reclamation plans <br /> for this operation. <br />6-3-93 Division received the engineering proposal to remine the east wall and <br /> expand the excavated limits 50-100 feet to the east. <br />6-25-93 The operator hoped to get an amendment to the Division by mid-July. <br />6-30-93 Operator had not submitted the required amendment. <br /> <br />WCY/e rn <br />M:\oss\ern\morrison.wcy <br />(7/19/93) <br />