My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11517
DRMS
>
Back File Migration
>
Revision
>
REV11517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:29 AM
Creation date
11/21/2007 10:23:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
10/30/2002
Doc Name
Response Letter
From
DMG
To
Energy Fuels Mining Company
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Why lower the emergency spillway when the primary, 4-inch riser could be raised to <br />hold the desired pool of water? Lowering the emergency spillway will not achieve the <br />purpose of storing a 1.8 acre-ft pool of water without some mod'+fication to the primary <br />discharge structure. (see next question) <br />3. (new) Rule 4.05.17 requires that a permanent impoundment be renovated to the <br />"detailed design plan for the permanent structure" before abandoning the permit area. <br />The Division understands that the language included on page 482R, (third paragraph <br />from the bottom) constitutes the detailed design plan for the permanent impoundment. <br />Please include with this language what changes or modifications will occur to the <br />primary spillway (4-inch riser). <br />4. (new) Construction of permanent drainages and pond modifications are key parts of <br />the final reclamation plan. Previously the Division has calculated the reclamation cost <br />estimate for the site. Would you like the Division to calculate costs for these two <br />reclamation tasks or would EFMC like to submit an estimate for these tasks for <br />Division review. Please let us know. <br />5. (new)Removal of WSD # 5 will increase flow to the south mine access road ditch. <br />This ditch has been subject to erosion even with WSD#5 in-place. Please ensure that <br />any proposed channel lining for the south mine access road ditch is adequate for <br />permanent flows. <br />Sinc el ,~~~~ <br />Ke t A. Gorham <br />Environmental Protection Specialist II <br />
The URL can be used to link to this page
Your browser does not support the video tag.