Laserfiche WebLink
Page 2 <br />Mr. Joseph Dudash <br />July 2, 1993 <br />All cleanup work is continuing. <br />C-93-040 A contractor has been retained and is removing <br />scrap from the warehouse area. Most other sites have been <br />cleaned and reclamation has been initiated for certain other <br />areas. <br />For July 15 Abatement: <br />C-93-041 Coal slurry has been removed from terraces and <br />outslopes and the areas reseeded. Final cleaning of the Gabion <br />baskets on the top bench will be completed. <br />C-93-058 Spillage from refuse conveyor has been cleaned as <br />have the drip pans. Disturbed material outside sediment control <br />areas is being removed. Windblown coal in the buffer zone is <br />being removed. Other work is complete or will soon be completed. <br />C-93-062 Road ditches are nearly completed. Revisions have <br />been submitted to the Division. <br />If you have any questions, please contact me at (719) 868- <br />2761, Extension 107. <br />Sincere y, <br />~~ /~~~~ <br />Rofita d Q'. Thomps <br />Senior Mine Eng~ eer <br />RGT/bb <br />