My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23270
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:39 PM
Creation date
11/21/2007 10:23:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
6/25/1993
Doc Name
REQUEST FOR NOV ABATEMENT DATE EXTENSION NEW ELK MINE PN C-81-012
From
BASIN RESOURCES INC
To
MLR
Violation No.
CV1993034
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIII~IIIIII III 300 Highway 12 <br />Weston, Colorado 81091 <br /> (719)868-2761 <br /> FAX (719) 868-2275 <br />-~ <br />BASIN <br />RESOURCES,iNC. July 2, 1993 <br />a subsidiary of ENTECH, Inc. <br />:~°- <br />Mr. Joseph Dudash RFrFIVFp <br />Reclamation Specialist <br />Office of Mined Land Reclamation JUN 25 199 <br />1313 Sherman Street, Room 215 3 <br />Denver, CO 80203 <br />Division of ldineiuis a ~:cu,c:9Y <br />RE: Request for NOV Abatement Date Extension <br />New Elk Mine Permit No. C-81-012 <br />Dear Mr. Dudash: <br />Due to the large quantity of remedial work required by the <br />NOV's issued during the April 5 through 9 and April 12 through 16 <br />inspections, a contractor has been retained and has been working <br />seven days per week. Therefore Basin Resources, Inc. (BRI) <br />requests an abatement time extension from June 11 to July 8 for <br />certain NOV's and to July 15 for certain others. Following is a <br />listing of those NOV's: <br />For July 8 Abatement: <br />C-53-034 Final additions and line clearing is underway. <br />C-93-035 Most work on cleaning culverts and drop inlet 270. <br />2 has been comfrleted. A seoti.cn of culvert has been ordered to <br />close the open inlet center of C5. Work on cleaning remaining <br />culverts and attempting to locate the outlet of the "fireplug" <br />culvert and open the D26 to river culvert is underway. <br />C-93-036 All upland diversion ditches have been cleaned, <br />reshaped and increased in cross section to design. Most other <br />listed ditches have been reworked or newly cut. Remaining work <br />is in progress. <br />C-93-038 Revisions have been submitted to remove culverts <br />no longer required or in service. Culvert C40 has been installed <br />and C13 will be removed. <br />C-93-039 A culvert has been installed in D11. Coal <br />spillage east of the silo:a teas been cleaned. Spilled oil :and <br />contaminated soil have been placed in drums. Samples have been <br />submitted to the processor for evaluation and directions to BRI <br />for shipping. Cleaning of the windb?own coal is in progress. <br />
The URL can be used to link to this page
Your browser does not support the video tag.