Laserfiche WebLink
3 Move topsoil stockpile material to 1.0 $11180 <br /> 23.1 acres of disturbed azea 3" thick. <br /> Move with truck/loader and spread <br /> with Cat D-5. (9317 cy @ $1.20 per <br /> cy) <br />4 Final grading of soil. Use Cat D-5. $5,775 <br /> Cost is $250/acre x 23.1 acres. <br />5 Broadcast seed in wetland areas. 1.59 0.5 $915 <br /> Acres x $474.9 per acre +$100 appli- <br /> cation cost. <br />6 Broadcast seed in range areas. 19.19 0.2 $4354 <br /> Acres x $126.9 per acre + $100 appli- <br /> cationcost. <br />7 Plant tree saplings in certain azeas. 0.2 $532 <br /> 2.32 Acres x $129.7 per acre + $100 <br /> per acre application cost. <br /> <br /> <br /> Totals 3.9 $41,856 <br /> DMG Costs (21% z direct costs) $8,790 <br /> Total Boud Amouut $50,646 <br />Alma Placer 7/03 78 <br />