My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11400
DRMS
>
Back File Migration
>
Revision
>
REV11400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:22 AM
Creation date
11/21/2007 10:22:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Revision
Doc Date
5/22/1998
Doc Name
BULLDOG MINE RECLAMATION PROJECT 9360 LEVEL ADIT CLOSURE MONITORING PLAN
From
HOMESTAKE
To
DNR
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br />1 <br /> <br /> <br />3 LONG TERM ADIT MONITORING <br />The overall objective of the long term adit monitoring is to evaluate the long term plug <br />performance as part of the final closure and reclamation of the Bulldog Mine. The monitoring <br />described below will be conducted following the period of plug construction once the plug and <br />portal areas are considered stable. The duration of the long term adit monitoring is planned for <br />two years. As appropriate, based upon monitoring results and evaluation, the monitoring program <br />will be revised in concurrence with DMG. Ultimately, satisfactory performance and monitoring <br />results will be used to support a recommendation for discontinuance of the monitoring program. <br />Overall, the long term adit monitoring program is similar to the adit plug construction monitoring <br />program with the exception of frequency. A summary of the long term adit monitoring program is <br />provided in Table 3.1. Each measurement is described below. <br />3.1 Infiltration trench monitoring <br />In the event that seepage from the adit is delivered to the infiltration trench during this monitoring <br />period, monitoring related to the infiltration trench will be pertormed on a monthly basis, with the <br />exception of the Trench-Intel water quality sampling, which will take place quarterly. The <br />procedures for carrying out the infiltration trench monitoring will be as described in the previous <br />discussion (Section 2.1) regarding the adit plug construction monitoring data collection. <br />If the infiltration trench is in operation during any part of a given month, data gathered as it relates <br />to the infiltration trench monitoring will be summarized as part of the reporting described in <br />Section 3.5. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.