My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11396
DRMS
>
Back File Migration
>
Revision
>
REV11396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:22 AM
Creation date
11/21/2007 10:22:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
8/10/2004
Doc Name
Adequacy Issues
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR26
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-26 Well Permit <br />>n SGC's TR-26 application, SGC stated that removal of tailings during the Power Plant <br />Tailings removal project may expose groundwater. The Division, as part of the adequacy <br />review process, required SGC to contact Jeff Titus of the State Engineers Office to <br />determine if a well permit was required or if a notice to construct a pond was required. <br />Jeff Titus was contacted and SGC answered the adequacy review issue with the following <br />statement/commitment. <br />Jeff Titus of the State Engineers Office, Division of Water Resources (DWR) was <br />contacted concerning exposure of groundwater during the reclamation project and <br />the possible construction of a pond. He agrees that with the limited information <br />now available it would be acceptable for SGC to wait until the information <br />needed for a General Well Permit is available. If a pond that exposes groundwater <br />is constructed, SGC will obtain a General Well Permit from DWR. <br />On August 5, 2005, Jeff Titus of the State Engineers Office, Division of W ater Resources <br />inspected the Power Plant Tailings azea and verbally notified me that with the small <br />exposure observed, he saw no need for an application for a well permit. Therefore, SGC <br />believes its commitment concerning well permits for exposure of groundwater in the <br />Power Plant Tailings removal area has been fulfilled. If this is not the case, please outline <br />what further steps are required to fulfill this commitment. <br />Sincerely, <br />~`-,~ ~ <br />Larry Perino <br />Reclamation Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.