My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23224
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:37 PM
Creation date
11/21/2007 10:22:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/12/1993
Doc Name
REVISED MEMO OF UNDERSTANDING BATTLE MOUNTAIN RESOURCES INC
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. The monitoring locations for each third party sampling event shall be <br />designated by DMG in advance of the sampling event and shall be <br />selected from the following approved monitoring locations: <br />a. Groundwater Monitoring Wells M-6, M-7, M-8, M-9, M-12, <br />M-13. <br />b. Surface Water Monitoring Site f«T RS~S.. <br />c. The Lower and Upper Tailings Ponds and the Cdllection Pond. <br />3. In the event that DMG determines on the basis of third arty sampling <br />that monitoring data obtained from the tailings facility by BMRI are <br />inaccurate or unreliable, DMG may direct the third party sampling <br />contractor to conduct additional independent sampling apd subsequent <br />sample analysis in accordance with the requirements oflthis MOU, at <br />the sole discretion of the DMG provided that such word is within the <br />work description and budget set forth in the scope of worrk attached to <br />the Contract. In the event that such work is not wi}hin the work <br />description and budget set forth in the scope of work, thien DMG may <br />propose a change order to the Contract. <br />B. Direction of Sampling Activity <br />I. The DMG, through its project manager, shall direct the sampling and <br />analytical efforts of the third party sampling contractor. <br />2. BMRI shall provide the DMG project manager a sdhedule of its <br />anticipated sampling activities which the DMG project -nanager shall <br />direct the third party sampling contractor to follow to 'the maximum <br />extent possible so that unnecessary redundant and duplic$tive sampling <br />is avoided. <br />3. The DMG shall provide BMRI a minimum of five (5) working days <br />notice to coordinate the sampling activity with its sampling personnel <br />or contractor. <br />4. In an effort to facilitate coordination and safe working conditions, third <br />party sampling contractor shall report to BMRI personnel immediately <br />upon arrival at the minesite and shall remain under th~ direction of <br />BMRI during the course of performing the sampling activity required <br />hereunder. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.