My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23208
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:37 PM
Creation date
11/21/2007 10:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979206
IBM Index Class Name
Enforcement
Doc Name
NOV & CEASE & DESIST ORDER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. <br /> <br /> establishment of a base for the Climax Woodland- <br />'•~ Shrub (Pinon-Juniper) vegetative type, <br /> <br /> The plan will be three phases: <br /> Phase I: Backfill, grade, surface contouring; <br /> general earth-moving operations. <br />~ <br />,~ <br />! <br />Phase II: Surface treatment of vegetative/mulch/ <br />E <br /> fertilizer mixture. <br /> Phase III: Addition of potted trees (pinon-juniper) <br /> to the established grassland site if no natural <br /> <br /> (volunteer) seeding has occurred; Continuation of <br /> natural (volunteer) vegetation/shrubs; discontinua- <br /> tion of treatments to allow natural cycle to occur. <br /> (See also Section F (iii) below). <br />~, During treatment of the site and until establishment of <br />• potted and/or volunteer pinon-juniper species it is not <br /> anticipated that any public use on the site will take <br /> place (Rule 6, 116 (1)(6)). <br /> Ol Grading <br /> Grading and backfilling in both zones will be done so as <br /> to stabilize both zones (see Exhibit I for discussion of <br /> leaching and-s.oil properties). The primary purpose here <br /> is to prevent and control erosion, sedimentation, and <br /> surface water run-off both through temporary measures <br /> as well as the final grading p:l.an (See Exhibit G, Water). <br /> The highwall in Zone 2 will be stabilized and final <br /> height wil,1 be as low as possible. both for reclamation <br /> procedures and so as not to constitute a hazard. <br />• \ <br /> i <br /> •~~ <br />. . <br /> . .. E. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.