<br />The estimated volume of material that will be moved by phase is: <br />Phase I: 8,500 bank cubic yards, <br />Phase II: 5,300 bank cubic yards. <br />Total Volume: 13,800 bank cubic yards. <br />The attached Table 1 presents the mass balance for the regrading work and is based on the current <br />topographic map Exhibit 17 and cross sections, Exhibit 18, Sheets 1-3, developed from the topo <br />map and soil testing in the disturbed area. The current topographic map is developed from a <br />survey performed during September 1995 and updates the status of the disturbed area. The cross <br />sections show the current and pre mining as well as the proposed post mining topography. The <br />pre mining topography occurs in the undisturbed portions of the cross sections. <br />The post mining contours are based on a field inspection and a slope stability analysis performed <br />by Lincoln DeVore. The following soil samples were collected for this study: two bulk samples in <br />5 gal buckets, three split spoon samples and thirteen moisture samples. The study indicated that <br />the undisturbed slopes were expected to be stable with factors of safety in excess of 1.3. The <br />study also recommended that the coaUrefuse on the tipple bench out slope and the concrete be <br />buried on the toe of the bench cut slopes. A copy of this study is attached as Appendix 1 [o this <br />Technical Revision application. The post mining topographic map is presented in Exhibit 19, <br />The following equipment is expected to be used to establish the post mining topography: <br />Bulldozer D-6 or larger <br />Front End Loader <br />Hydraulic Excavator <br />The fill material will be placed in two foot lifts and compacted by mobile equipment, i.e. either a <br />bulldozer or front end loader. <br />The estimated reclamation task duration is: <br />Task Description <br />Duration <br />1. Remove of contents of buildings 6-8 weeks <br />2. Removal of buildings and other facilities 6-8 weeks <br />3. Backfill portals and benches <br />4-6 weeks <br />