My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-15_REVISION - M1989120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989120
>
2004-01-15_REVISION - M1989120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:10 PM
Creation date
11/21/2007 10:21:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
Revision
Doc Date
1/15/2004
Doc Name
Bond Recalculation
From
CIRCES
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task >f : 007 <br />Date : 01/15/2004 <br />User : KAP <br />State : Colo2do <br />County :Weld <br />Site :Platte Valley Operation <br />Permitfjob# : M-1989-120 <br />Abbreviation :none <br />Filename :M120-007 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :AM-001 <br />Task description :Replace Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DBR Serres 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.85 NA <br /> Operating cost/hour : $69.48 100 <br /> Ripper op. cost/hour : $3.85 50 <br /> Operator cosUhour : $31.83 NA <br /> Total unit cosUhour : $155.01 Total fleet cosUhour : $155.01 <br />:. <br />MATERIAL QUANTITIES .:. <br />~~~~ <br />~~ ~~~ ~ ~~~~~ ~~ ~ <br />~ ~~ ~ .. <br />~~ <br />Initial ~ Swell Loose <br />volume : 37,936 CCY factor : 1.125 volume : 42,678 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Dry Earth <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production ; 3778 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : >.00 (Cat HB) <br />Average site altitude : 4,940 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.50 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 189.21 LCY/hr <br /> Adjusted fleet production : 189.21 LCY/hr <br />- <br />,: <br />JOB TIME AND COST ;: ,> <br />Fleet size : > Dozer(s) Total job time : 225.55 Hours <br />Unit cost : $0.819 /LCY Total job cost : $34,964 <br />
The URL can be used to link to this page
Your browser does not support the video tag.