Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task >f : 007 <br />Date : 01/15/2004 <br />User : KAP <br />State : Colo2do <br />County :Weld <br />Site :Platte Valley Operation <br />Permitfjob# : M-1989-120 <br />Abbreviation :none <br />Filename :M120-007 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :AM-001 <br />Task description :Replace Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DBR Serres 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.85 NA <br /> Operating cost/hour : $69.48 100 <br /> Ripper op. cost/hour : $3.85 50 <br /> Operator cosUhour : $31.83 NA <br /> Total unit cosUhour : $155.01 Total fleet cosUhour : $155.01 <br />:. <br />MATERIAL QUANTITIES .:. <br />~~~~ <br />~~ ~~~ ~ ~~~~~ ~~ ~ <br />~ ~~ ~ .. <br />~~ <br />Initial ~ Swell Loose <br />volume : 37,936 CCY factor : 1.125 volume : 42,678 LCY <br /> <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Dry Earth <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production ; 3778 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : >.00 (Cat HB) <br />Average site altitude : 4,940 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.50 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 189.21 LCY/hr <br /> Adjusted fleet production : 189.21 LCY/hr <br />- <br />,: <br />JOB TIME AND COST ;: ,> <br />Fleet size : > Dozer(s) Total job time : 225.55 Hours <br />Unit cost : $0.819 /LCY Total job cost : $34,964 <br />