Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 01/152004 <br />User : KAP <br />State :Colorado PermiUob # : M-1989-120 <br />County :Weld Abbreviation :none <br />Site :Platte Valley Operation Filename : M120-006 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : AM-001 <br />Task description :Scarify roads and plant site <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series Il - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $49.85 NA <br />Dozer operating cosUhour : $69.48 100 <br />Ripper operating cosUhour : $7.70 100 <br />OperatorcosUhour : $31.83 NA <br />Total unit cosUhour : $158.87 Total fleet cosUhour : $317.73 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 19.00 acres Rip depth (ft) : 2.00 Volume : 61,307 BCY or CCY <br />Source of estimated quantity :Reclamation Plan <br />Source of estimated load factor : NA <br />.: ,. .. <br />,,; <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />NA feeUsecond <br />NA cu. yds./hour <br />Unadjusted production <br />per selected method : 1,247.33 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 4,940 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeUpass Job efficiency factor : 0.83 (1 shifl/day) <br />Average dozer speed : 88.00 feeUminute Netjob correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.773 acres/hour Adjusted unit production : 1,035.28 cu. yds./hour <br />Unatljusted production : 1,247.33 cu. yds./hour Adjusted fleet production : 2,070.56 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 2 dozers) Total job time : 29.81 hours <br />Unit cost : $0.153 per cu. yd. Total job cost : $9,408 <br />