My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11036
DRMS
>
Back File Migration
>
Revision
>
REV11036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:01 AM
Creation date
11/21/2007 10:19:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Revision
Doc Date
1/6/1994
Doc Name
SLAB CANYON LIMESTONE QUARRY PN 77-347 ADEQUACY REVIEW
From
DMG
To
HOLNAM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLC)RADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: 13031 866-3567 <br />FAX:13031832-8106 <br />January 6, 1994 <br />Mr. Paul E, Thomsen <br />Plant Engineer <br />Holnam, inc. <br />j~ ~ ti . <br />r, ~I <br />P.O. Box 2227 <br />Fort Collins, Colorado 80522 <br />I <br />}'1 <br />~rlf~ <br />Re: Slab Canyon Quarry, Adequacy Review, File No. M-77-3~~7 <br />Dear Mr. Thomsen: <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Director <br />Listed below are adequacy review comments pertaining to the <br />Addendum to the above-captioned permit application. Your response <br />to the following adequacy review concerns should be submitted to <br />the Division by January 22, 1994. <br />EXHIBIT D - Mining Plan <br />1. A portion of the future phase 5 haul road is located outside the <br />amendment boundary. Please revise Exhibit C to include this haul <br />road within the permit boundary. <br />2. Phases of Mining Plan - The applicant states that Phase 4 may <br />not be disturbed and Phase 5 requires a drilling program before a <br />detailed mining plan can be established. A financial warranty <br />cannot be calculated for these phases without more definitive <br />mining and reclamation plans. Thus, the financial warranty will <br />only be calculated for Phases 1, 2 and 3. Pursuant to C.R.5.34-32- <br />? the operator is required to submit to the Division mining <br />methods, erosion control methods and a timetable that establishes <br />the relationship between mining and reclamation in the ph~lses. We <br />reiterate that if this information cannot be provided at ttlis time, <br />the applicant will be required to submit an amendment to ttte permit <br />before mining is initiated in phases 4 and 5. <br />OF'~~(O <br />~~ 4 <br />„~; <br />. ~Q~ <br />•~/8'!6~ <br />Surface Runoff Control And Offsite Erosion - The Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.