My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10917
DRMS
>
Back File Migration
>
Revision
>
REV10917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:21:54 AM
Creation date
11/21/2007 10:18:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979140
IBM Index Class Name
Revision
Doc Date
5/1/1997
Doc Name
LEMOINE GRAVEL PIT APPLICATION FOR CONVERSION
From
DELTA CNTY COLO
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oi'Ol~~i 1S: id $~i0 'll~ <br />LEMO!lvE GRA r'EL P!T <br />DELTd COL'ST]' . <br />E ~YHltf!%""D" PAG£1 <br />Future mining activin~ is as follows: <br />PHASE I - Complelc mining gravel deposit beginning in part of the NW 1l~. SE 1!4 of Section 20, T145. <br />R92W. 6th P.M.. at the NW comer of the existing mined out area Mimti_e will run in a northeastern <br />direction and will extend into a portion of the NE I/b, SE I/S oC Szction 211. T1iS. R 92W, 6th P.M. (See <br />attached Exhibit "C" for more complete details.l Total acreage anticipated for Phase I is 6 - 7 aces and <br />the estimated time for completion of Phase [ is i years. <br />2. PHASE P -Complete mining gravel deposit beginning along the southwest side of ttte existing permitted <br />area running NE to the end of the permitted area. Total acreage anticipated for Phase ^ is approximately <br />I - 2 acres and the estimated time for completion of this phase is 6 - 7 years, <br />As the mining progresses to the Northeast the azeas previously disturbed will be reclaimed as required and the <br />stoc6pile of graver will be moved in relation to the staging area and stontge for County equipment and wotic. <br />The deposit being mined is a graceUrock dcposil and is approximately 301t0 feet in depth the sIIatum <br />immediately below the depposit is shale. <br />Due to the fact that this pit is utilized onl}• once a year for 60 - 90 days, it will be a number of vears before the <br />mining operation is brought to completion. <br />lQ 00,9 <br />GPLEMOiD.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.