<br />Page 2 <br />March 22, 199G <br />Snyder Corrective Actions <br />Fred Banta <br />Culverts HRQ and HR5 have been installed as of this date. <br />By March 23 or March 26 at the latest, the remaining <br />culverts will be installed. There still needs to be some <br />work done on the inlets and outlets, but at least the pipe <br />is in. <br />After completion of the culvert installations, Disturbance <br />Areas #2, #3, and #4 will be corrected. This should be done <br />by early April. Topsoil will then be applied to sll four <br />areas at the same time and immediately seeded. Thus, by <br />mid-April ell the disturbance areas along the road shoul3 be <br />just entering the revegetation stage. <br />The trees were ordered last winter and are scheduled to <br />arrive on April 11 and 12. These will be planted in the <br />third to last week of April. <br />We still have not received a review of the silt basin plain <br />from John Doerfer or Dan Hernandez. This is of consideratble <br />concern to us. We provided a 60 day lead time so your s1;aff <br />could review the plans and any questions answered prior i;o <br />construction in early April. We expected to have a review <br />by early March, but here it is almost April 1 and John <br />Doerfer hasn't even looked at it, according to my <br />understanding from Dan Hernandez. We wish to point out i.hat <br />this sediment basin is a vital part of the whole corrective <br />action plan. If it is not installed before May we could <br />suffer severe erosion damages on Disturbance Area #1. <br />I will be gone from March <br />send any communications on <br />Morgan at Castle Concrete. <br />the appropriate parties. <br />26 through April 8. Therefore, <br />this matter directly to Gordon. <br />Gordon can then pass it on tc <br />Thank you. <br />Respectfully, <br />~~~~ ~~ <br />Mark A. Heffner <br />cc: Gordon Morgan <br />Scott Briggs <br />Roland Obeying <br />