Laserfiche WebLink
CIRCES Cost Estimatina5ottware <br />PROJECTIDENTIFlCATION <br />UNR COSTS <br />Last unit cost uptlate: January 2001 Location atljustment: 89.00% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION OUANTITV UNIT UNIT COST TOTAL COST <br />-Potable Water Filler Bb. ]550 cu. h. Demo/tlisp./appr tlump-lp l5 mi. 755000 CF $05686 $4,293.0] <br />-Potable Water Filter BM. Concrete Floor ]555q.tt. Blasddisp. on site 755.00 st 51.3500 $1,019.25 <br />Concrete Footers- leave in place <br /> <br />-Potable Water Valve Prt Bld 360 cu N. Oemp/displappr dump-lo t5mi. 360.00 CF 305686 520470 <br />-Potable Wafer Valve Pit GOncrele Floor 60 sq.k Blastldisp. on site 60.00 s/ $1.3500 581.00 <br />Concrete Footers- leave in place <br /> <br />-Potable Water Disinlecfanl810 504 cu. h. Demo/tlisp /apps tlump-fo l5 mi 504.00 CF $0.5686 5286.58 <br />-Pplable Wafer Disinlecfanl Bltl. Concrete Floor 72 sq. R. BlasVdisp. pn site ]200 s/ 51.3500 39720 <br />Concrete Footers- leave ih place <br /> <br />-Potable Water Electrical Bld. 432 cu. M. Demo/tlisp /appr. dum~-fo l5 mi. 432.00 CF 505686 $2d564 <br />-Potable Water Electrical Concrete Floor 5a sgtt. Blastldisp. on site 54.00 s/ 31.3500 $]2.90 <br />Concrete Footers- leave in place <br /> <br />-Firewater Building 880 cull Demo/tlisp./appr dump-fo l5 mi 880.00 CF $0.5686 550038 <br />-Firewater Concrete Floor 805q. h. 81as1/tlisp~on site 80.00 s/ 51,3500 5108.00 <br />Concrete Footers- leave in place <br /> <br />-Sewage Treatment PWnf 50731 cu.R Demo/tlisp /apps dump-fo l5 mi. 50,]31.00 CF 30.5686 $28,846.15 <br />-Sewage treatment Plant Concrete Floor 4081 sq. R. Blasbdisp. qn srfe 4.081.00 sl 31.3500 35,50935 <br />Concrete Footing- leave in place <br /> <br />-POpane Building 6280 cu. h. Demo/tlisp/apps dump-ro 15 mi. 6280.00 CF $0.5686 33,57087 <br />-Propane Building 6260 BlasVdisp. on site 62800 sl 31.3500 584780 <br />Concrete Footing- leave in place <br /> <br />-Bld atlj. (p Surge Tank 6420 cv. R. Demo/lisp/appr. dump-ro 15 mi. 6,420.00 CF 305686 33.650 dB <br />-Bltl. atlj. ro Surge Tank Concrete Floor 494 sqh. Blastldisp on site a9a.00 s/ $1.3500 9666 90 <br />Concrete Footers- leave in place <br /> <br />-ASphall Demolition 35 acres Pa vemenp N'Nm. 3'rh. 169,400.00 SY $2.8100 3476.014.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Task x: Ota <br />Date: 27-Jun-2002 <br />Agency or organization name :OMG <br />State:Coloratlo PermiVjobx: M-7977-342 <br />County:Clear Creek Abbreviation :none <br />Site :Henderson Mine Filename :M3d2-01a <br />Permitting action c Reevaluate amount of requiretl bond <br />Task tlescriptiCll : MIRa S(NC(U/al Dam0/1(IOR ~CORY.f <br />JOB COST Total letl{. for lo[etlon): $468,153 Total COSt (una6{usb4): 6526,014 <br />