Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />Agency or organization name <br />Ola <br />27JUn-2002 <br />Sta[e:COloratlo PermiVlobk: M-1977-342 <br />County Clear Creek Abbreviation none <br />ESC Site: Henderson Mine Filename:M342-01a <br />~evaluale amovn] of required bond <br />Ina Structural Demolition <br />Last unit cost uptlate: January, 2001 Location atljustmenl: 8900% <br /> DIMENSIONS <br />880800 cu. tt. <br />56960 DEMOLITION MENU SELECTION <br />Demo/tlisp./apps dump-ro 15 mi. <br />B/as/PorsR. on site QUANTITY <br />880,80000 <br />56,950. D0 UNIT <br />CF <br />sl UNITCOST <br />$0.5912 <br />51.3500 TOTAL COST <br />$520.69720 <br />576,89600 <br /> <br /> <br /> 10]0900 cu. tt. Demoldisp /apps dump-lo lSml. 1,0]0.90000 CF 30.5912 5633,0]7.4] <br /> 412]8 sq.lf. BIas1/tlisp. on site 41,2]8.00 st 51.3500 $5572530 <br /> <br /> <br /> f6Ti, 800 cult. DemoMisp.rappr Wmp,ro l5mr. 160, BOO GYI CF $0.5912 595.05916 <br /> 8g655q. h. BlasUdisp. on site 8,465.00 sl $1.3500 511,42]JS <br /> <br /> <br /> 59600 tuft Demoltlisp /appr, dump-to l5 mi 59,60000 CF 30.5912 335,233.3] <br /> 3WSSq. B. Blas1/disp. an site 3.9]5.00 sl St3500 55.36625 <br /> <br /> <br /> SOO,S000CU. tt. Demo./disp./appr dump-to l5mi. 500,500.00 CF 50.5912 5295.87755 <br /> 5382 sq.h BIaslPoisp. on silo 5,38200 sl 51.3500 5].265.]0 <br /> <br /> <br /> 290000 cu. fl. Demo/tl15p /appr. dump-to l5 mi 290,000.00 CF 505912 Si]1,a3].54 <br /> 9669 sq. tt. BIasD'tlisp on site 9.66900 sl 51.3500 $13.053.15 <br /> <br /> <br /> 849900 cuh Demo PoBp/apps dump-lo l5 mi. 849,900.00 CF 505912 5502430.24 <br />-b2 Sha/f Concrete Floor 49]0 Sq.1t. BlasUdisp. on site 1,910.00 s/ 51.3500 $6,709 50 <br />Concrete Footings- leave m place <br /> <br />-p25hett HOislhouse 361000 cu. h. Demo./drsp./appr. dump-to l5 mi. 361,OOOOD CF 50.5912 5213,410.18 <br />-b2 Shah HOisthouse Concrete Floor 7x414 sq.R. Blast/disp. on srte ]x,41400 s/ 31.35170 519.x5690 <br />Concrete Focfings- leave in place <br /> <br />-N3 Shah Heater Builtling 217400 cu. tt. Demo./dap./apps tlump-to ]5 mi. 21],400.00 CF $05912 3128.519.04 <br />-x39hd$HealarBwldipg Concrete Floor ]248 BlesUdisp. on site ],248.00 sl 51.3500 SBJ84.80 <br />Concrete Footings- leave in place <br /> <br />-Aggregate Blacking Builtling 2]800 Demp/tlisp./appr tlump-to l5 mi. 27,800,00 CF 505686 515,80].36 <br />~Agg. Slacking Building Connate Floor 1855 sq. tt. Blasf/disp. on s4e 1.855.00 sl 51.3500 $2,504.25 <br />GMCrele Footings, leave in piece <br /> <br />-BM. adj ro Slaclrurg HuUring 2600 cu. tt. Demo./tlisp./apps dump - to 15 mi. 2.600.00 CF 50.5686 5 ],x]8.39 <br />-Concrete Floor 200 sq. h. Blasf/dis0_on site 200.00 s] 51.3500 5270.00 <br />Concrete Fooling leave in place <br /> <br />-Balch Plant 21900 cu. h. Demo./disp./appr. dump-lo i5 mi. 21,9W.00 GF 30.5686 512,452.56 <br />-Batch Plant Concrete Floor 1458 sq. k. BIa5lNisp. on site 1.45800 s7 51.3300 51,96630 <br />Concrete Footing- leave m place <br />-Bulk Od Storage Builtling <br />-Bulk Oil Storage Concrete Floor 18000 cull. <br />1200 sq. K. Demo./disp/appr. dump - fo 15 mi. <br />elast/disp. on s4e 18.000.00 <br />1,200.00 CF <br />sl $0.5686 <br />51.3500 510.23J.98 <br />51.620.00 <br />Concrete Foolnng- leave in place <br />-Bld adj to USetl Oil Tank <br />-Bld. adj. to Oil Tank Concrete Floor 1260 cu. tt. <br />126 sgtt. Demo/disp /appr. dump-lo i5ml: <br />BlasUdisp. on sJe r,26000 <br />126.00 CF <br />st 503686 <br />31.3500 $116.45 <br />9170.10 <br />Concrete Footing, leave rh placro <br /> <br />-F~p CpnfroVSwitch Gear Bld 38100 tuft Demo./tlisp./appr. dump-(o 15 mi. 38.100.00 CF 50.5686 $21,664.04 <br />-Fan COnfroVSwl;ch Gear Concrete Floor 2928 sq.5. BlasVdis0~on site 2,92600 si 51.3500 33.952.80 <br />Concrete Footing leave in place <br /> <br /> <br /> <br />JOB COST <br />Total (atl). for location): $2,558,099 <br />Total Lost (unadjustetl): 32.874,268 <br />