Laserfiche WebLink
CIRCES Cost Estimatin~Software <br />DIRECT COST SUMMARY FORM <br />Date : 02-Jul-2002 <br />User : ESC <br />Task: 000 <br />Permit or job no.: M-1977-342 Site :Henderson Mine <br />Abbreviation : none State :Colorado <br />Filename: M342-000 County :Clear Creek <br />Agency or organization name : DMG <br />Permit or job action :Reevaluate Amount of Required Bond <br />Task description :Summary (Tasks Ofa•03i) <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />Ola -Mine Site; Structural Demolition (pg. l) demolish 1 500.0 $2,558,099 <br />Ol a -Mine Site Structural Demolition (pg. 2) demolish 1 500.0 $468,153 <br />01a -Mine Site Structural Demolition- Removal of Chemicals (pg. 3) demolish 1 40.0 $69,301 <br />Ofb -Seal Mine Shafts (#1, #2, #3, #5) mineseal 1 200.0 $494,341 <br />Olc -Remove Culvert from West C/earCreek demolish 1 80.0 $33,786 <br />Old -Excavate West Clear Creek Channel & Cover Demolished Concrete truckl 1 775.5 $378,396 <br />Ofe -Reestablish West C/ear Creek NA 1 80.0 $22,758 <br />01f -ReestablishBut/erGulch NA 1 20.0 $6,330 <br />Otg -Backfill & Grade Pond 1 dozer 1 22.0 $3,170 <br />Olh -Backfill & Grade Pond 1.1 dozer 1 78 $1,128 <br />Ol i -Backfill & Grade Pond 1.2 dozer 1 276 $3,962 <br />Oij -Purchase/Haul/Spread Cap Barrier on Pond 1.2 truckl 1 3.6 $22,442 <br />Oik -Purchase/HauUSpread Growth Media on Pond i.2 truckl 1 6.7 $35,077 <br />Ofl -Backfill & Grade Pond 2 dozer 1 24.9 $3,584 <br />O1m -Rip Roads around Mine Site ripper 1 49.3 $7,600 <br />Oln -Finish Grade Mine Site grader 1 10771 $12,322 <br />010 -ApplyAgricu/tural Lime NA 1 2D.0 $1,175 <br />Oip -Wood Chips & Sewage Sludge (Purchase/Haul) NA 1 40.0 $57,600 <br />01 q -Mix Wood Chips & Sewage Sludge into Soil ripper 2 261.6 $80,689 <br />Oir -Revegetate Mine Site; drill seed slopes <3h:1 v revege 1 60.Oq $57,458 <br />01s -Revegetate Mine Site; hydroseed slopes >3h:1 v revege 1 60.00, $98,096 <br />Olt -Revegetate Mine Site; tree & shrub transplants revege i 120.00, $2G0,527 <br />Ol u -Maintenance Ferterlize Mine Site- 3X revege 3 24.Od $14,414 <br />Olv -BUfferAreaReclama[ion NA 1 1.0 $53,968 <br /> <br />02a -Remove Exhaust Collar & Seal Shaft mineseal 1 ~ 80.0 $46,276 <br />026 -Revegetate Vent Shafr Ana; hand seed 1 acre revege 1 6.00, 53,701 <br /> <br />03a -Portal Area; Structural Demolition ~ demolish 1 ~ 150. D $62,195 <br />03b -Seal Portal Tunnel mineseal 1 150.0 $684,028 <br />03c -Rip Portal Facility Area ripper 1 49.7 $7,511 <br />03d -Backfill & Grade Portal Facility Area dozer 1 112.7 $16,175 <br />03e -Reestablish the Williams Fork Drainage excavate 1 29.4 $2,573 <br />03f -Revegetate Portal Area ~ revege 1 ~ 20.0 $17,237 <br />03g -Maintenance Fertedize Portal Area- 1X revege 1 ~ 4.0 $1,808 <br />03h -Revegetate Portal Area; tree & shrub transplants revege 1 40.0 $35,084 <br />031 -Road Bridge Removal on Williams Fork Drainage demolish 1 80.0 ~ $73,602 <br /> <br /> <br />SUBTOTALS : 3,756.0 $5,579,566 <br />