Laserfiche WebLink
The seed mix will be planted by a drill with adequate agitator. The seed houses in the area have an <br />adequate sup- ply of these varieties. Late Fall seeding is preferred. If this is not possible, this seed will <br />be planted in the early Spring. <br />(e) Schedule indicating how and when reclamation will be implemented. <br />(i)(ii)(iii) estimate of periods of time required for various uses of reclamation. size and location. <br />sequence. <br />Phase Acreage Mining Time Reclamation Completion <br />I 19.65 A 7 years 3 years after mining <br />II 13.00 A 7 years 3 years after mining <br />III 15.00 A 6 yeazs 3 years after mining <br />IV 16.9 A 5 years 3 yeazs after mining <br />V- 16.9 A amended 1 year 3 years after mining <br />(f) Description of each of the following: (i) Final grading <br />Pit floor will be left level with a slight pitch to <br />the west for positive drainage. Backslopes will be finished at 3H:1 V or flatter. <br />(ii) Seeding tomes, mixture,~uantities, time of seedine See (dl above. <br />(iii) Fertilization Yvpe, mixture, quantities & time of application. <br />A commercial fertilizer mix will be purchased from a local dealer and will contain 40#/A <br />available N & P. Fertilizer will be applied immediately before seeding and mulching. <br />(iv) ReveQetation - tvpe of trees, shrubs, etc. <br />Reclamation will be rangeland, so no trees or shrubs are proposed. <br />(v) Tomsoiling - Cascajo soils have limited cobbly topsoil, ranging in depth from 6" - 9". Pit floor and <br />backslopes will have 6" - 9" of this topsoil replaced. <br />