(ii) & (iii) Moderate & Minor Disturbance <br />It is the applicant's intent to combine these two items into one operation, with complete <br />reclamation following mining as closely as possible. There will be no: <br />1. backfilling of open cuts, <br />2. stabilization of waste dumps, <br />3. railroads, <br />4. evaporation or settling ponds, <br />5. leaching dumps, <br />6. waste storage or discharge areas. <br />Work, parking and storage areas will be in the major disturbance sector, as well as equipment, <br />machines, tools or other material on the property. There will be no structures of any kind on site. <br />Complete reclamation under these 2 combined items will'consist o£ <br />1. topsoiling <br />2. disking or chiseling, <br />3. fertilization, <br />4. seeding, <br />5. mulching <br />Combined moderate and minor disturbance acreage proposed - <br />18.00 A <br />(e) Timetable to describe the mining operation. The applicant proposes the same' acreage ratio through <br />thhe operation as described above: <br />Major disturbance followed by 22.69 A <br />Moderate disturbance <br />Minor disturbance combined 18.00 A <br />(i) Timetable: <br />Phase I - 19.65 A 7 years <br />Phase II - 13.00 A 7 years <br />Phase III - 15.00 A 6 years <br />Phase IV - 16.9 A 5 years- to be released- Phase V carries same time table <br />((i~) Description of size and location to be worked during each hp ase. See Mining & Timetable Map - <br />$xlubit C. <br />(iii) Outline the sequence in which each sta a or phase of the operation will be carried out. <br />