My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10763
DRMS
>
Back File Migration
>
Revision
>
REV10763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:21:45 AM
Creation date
11/21/2007 10:16:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
3/17/1995
Doc Name
TR-13 ADEQUACY PIT 1 FINAL CONFIGURATION KERR COAL CO MARR MINE PN C-80-006
From
DMG
To
KERR COAL CO
Type & Sequence
TR13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TR-13, Adequacy 2 C-80-006 <br />4. SEDCAD printouts and hydrology summary tables (pages 23-115, 23-115a and 23- <br />154) were submitted for ditches PD-3, PDT, PD-5 and culvert PC-3. Hydrology <br />data states that ditches PD-3, PDT, PD-5 and culvert PC-3 have all been designed <br />to safely pass the 100 year, 24 hour event; however, Table 23-18 indicates that <br />culvert PC-3 is designed for the 10 year event even though the peak flow listed is <br />that of the stated 100 year event. Table 23-18 also suggests that culvert PC-3 is a <br />single 24 inch diameter pipe rather than two 24 inch diameter pipes. Please <br />m..Ll_ if i /-,,, 1 A C A7\ a tote t t 3 1 f r <br />IeVIJe aaulc ~3-~8 ~Yage ~3-15~ c. Exhibit ~~~ .c s ha PC- :s designed e <br />the 100 year, 24 hour event and to state that PC-3 is actually two 24 inch diameter <br />pipes. <br />S. As stated above, SEDCAD printouts and hydrology summary tables were <br />submitted for ditches PD-3, PDT, PD-5; however, the submitted data did not <br />include channel designs for the three ditches. Please submit specific designs for <br />ditches PD-3, PD-4 and PD-5. <br />6. Page 23-151 of Exhibit 42 of the permit was revised to state that ditches PD-3, <br />PD-4, and PD-5, are shown on Map 16A and Map 37A. Map 16A was not <br />included with the TR-13 application packet. Please submit an updated version of <br />Map 16A, Mine Area Surface Water Hydrology, which shows the location of <br />ditches PD-3, PD-4, and PD-5, culvert PC-3 and the final topography of the Pit 1 <br />area modified under TR-13. <br />7. Removal of 27,000 cubic yards of road fill in Bush Draw will eliminate the access <br />road to Pond G and its associated topsoil stockpiles and sediment containment <br />ditches G-1 and G-2. Please address how access will be secured for maintenance <br />and reclamation for these structures. <br />Please contact me if I can be of greater service. <br />Sincerely, <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />cc: Jerry Nettleton, TerraMatrix, Steamboat. <br />Thomas Leidich, TerraMatrix, Lakewood. <br />
The URL can be used to link to this page
Your browser does not support the video tag.