My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10763
DRMS
>
Back File Migration
>
Revision
>
REV10763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:21:45 AM
Creation date
11/21/2007 10:16:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
3/17/1995
Doc Name
TR-13 ADEQUACY PIT 1 FINAL CONFIGURATION KERR COAL CO MARR MINE PN C-80-006
From
DMG
To
KERR COAL CO
Type & Sequence
TR13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i' -~ III IIIIIIIIIIIIIIII <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br /> <br />1317 Sherman 51., Room 215 - ~ <br />Denver, Colorario 80203 I~~~ <br />Phone: 13031 R66.3567 <br />FA%: 17031 832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br />March 17 <br />1995 <br />, RESOURCES <br />Mr. Geor a Patterson <br />g R°/ R°mer <br /> <br />Kerr Coal Company Governor <br /> dames 5. Lochhead <br />P.V. Box 4257 --.._..- ~-«:~ <br />C'O 8040 <br />Waldell Michael B. L°nF <br />, Division D"enor <br />RE: TR-13 Adequacy, Pit 1 Final Configuration, <br />Kerr Coal Company, Marr Mine, Perini[ No. C-80-006. <br />Dear Mr. Patterson: <br />The Division's review of TR-13 has generated additional comments to those stated in our <br />previous letters addressed to Mr. Leidich, dated 2/24/95 and 3/10/95. The additional <br />comments include: <br />1. Maps 37A and 37B differ in details concerning a road crossing ditch PD-4. Map <br />37A, Postmining Topography, shows a 600-foot long section of mine road <br />extending from the mine entrance road to the southwest corner of Pit 1. <br />Previously, this road provided access through Pit 1 from the mine entrance road. <br />Map 37B, Pit 1 Supplemental Backfill and Grading Plan, does not show this road. <br />Please update Map 37A to reflect current road configuration for drainage ditches <br />PD-4, PD-5 and culvert PC-3. <br />2. Maps 37A and 37B differ in details concerning the peak elevation of the ridge <br />which defines the western extent of Pit 1. Map 37A shows the west ridge of Pit 1, <br />rising to a peak elevation of 8325 feet. Map 38B shows this same ridge rising to <br />an elevation of 8315 feet. Ridgeline topography is a theme of TR-13. Ridgeline <br />elevations also affect material balance calculations. Please update Map 37A to <br />reflect the proposed postmining topography. <br />3. Map 37A (1/30/95 certification) shows a 400 foot diameter area marked as "Solid <br />Waste Disposal Area". The permit does not currently identify this area as being <br />an approved disposal site for solid waste. The Division would like to address this <br />issue under TR-12. Please remove the reference to the proposed disposal site <br />from Map 37A submitted with TR-13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.