Laserfiche WebLink
<br /> <br />4. The reclamation bond will be recalculated upon completion of this technical revision. <br />Backfilling of the wash pond will be included in the calculation unless the provision for a wash <br />pond is removed from the permit through this revision. Since the wash pond is already <br />backfilled, it is unknown if Mathias concrete still wishes to have a wash pond included in the <br />mining plan. Please clarify this situation. <br />If you need additional information, please contact me at the Division of Minerals and Geology, <br />Durango Field Office, 484 Turner Drive, Building F, Suite 101, Durango, CO 81301, phone no. <br />970-247-5062. <br />Sincerely, <br />~~ <br />Steve S. Shuey <br />Environmental Pro cti Specialist <br />