My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-07_REVISION - M1978052 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978052
>
2002-03-07_REVISION - M1978052 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:44 PM
Creation date
11/21/2007 10:12:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978052
IBM Index Class Name
Revision
Doc Date
3/7/2002
Doc Name
Adequacy Response (fax copy)
From
Jeff Schwarz MSSB
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WED 07 09 PM MASSEY SEMENOFF <br />FAX N0. 3038931829 <br />P, 04 <br />Tom Schreiner <br />March 6, 2002 <br />Page 3 <br />5. A note on sheet 2 of 8 states, "First Creek inflow spillway per Rec. <br />Plan." What portion of the Reclamation Plan is being referred to <br />here? <br />Response <br />This reference is to the "Howe Pit Amendment Drainage Plan Map" dated <br />August 22, 1990. <br />6. A note on sheet 2 of 8 states, "Bull Seep drop structure -see detail <br />H, Sht 8. Does this detail in fact appear on sheet 8? <br />Response <br />The note is incorrect. Please refer to sheet 7 of B detail H. <br />7. Sheet 2 of B indicates that approximately 1270 linear feet of the <br />existing Bull Seep alignment will be filled with onsfte materials. <br />What is the volume of material estimated for this work? <br />es onse <br />Approximately 8000 c.y. of onsite material will be used to backfill this <br />portion of the Bull Seep, <br />8. Verify the volume of soi/s that wfll be used to "line" the Bull Seep. <br />Response <br />It is assumed the lining in question is the use of salvaged topsoil on the <br />channel banks of the Bull Seep. Approximately 800 c.y. of onsite <br />salvaged topsoil material will be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.