Laserfiche WebLink
WED 07 09 PM MASSEY SEMENOFF <br />FAX N0. 3038931829 <br />P, 04 <br />Tom Schreiner <br />March 6, 2002 <br />Page 3 <br />5. A note on sheet 2 of 8 states, "First Creek inflow spillway per Rec. <br />Plan." What portion of the Reclamation Plan is being referred to <br />here? <br />Response <br />This reference is to the "Howe Pit Amendment Drainage Plan Map" dated <br />August 22, 1990. <br />6. A note on sheet 2 of 8 states, "Bull Seep drop structure -see detail <br />H, Sht 8. Does this detail in fact appear on sheet 8? <br />Response <br />The note is incorrect. Please refer to sheet 7 of B detail H. <br />7. Sheet 2 of B indicates that approximately 1270 linear feet of the <br />existing Bull Seep alignment will be filled with onsfte materials. <br />What is the volume of material estimated for this work? <br />es onse <br />Approximately 8000 c.y. of onsite material will be used to backfill this <br />portion of the Bull Seep, <br />8. Verify the volume of soi/s that wfll be used to "line" the Bull Seep. <br />Response <br />It is assumed the lining in question is the use of salvaged topsoil on the <br />channel banks of the Bull Seep. Approximately 800 c.y. of onsite <br />salvaged topsoil material will be used. <br />