Laserfiche WebLink
RECLAMATION COST ESTIMATE <br />Deserado Mine (C-81-018) -Minor Revision No. 101 <br />Direct Costs <br />Task 1 Rip and regrade coal laydown area $166.91 <br />Task 2 Rip and regrade road 137.98 <br />Task 3 Regrade pond 42.93 <br />Task 4 Redistribute topsoil 478.00 <br />Task 5 Remove structures 1,019.00 <br />Task 6 Haul roadbase, coal, and coal laydown base 643.00 <br />N/A Revegetation 748.47 <br /> Based on current Division estimated cost of <br /> $332.65/acre, with 50% failure rate, assuming 1.5 <br /> acres of disturbance. <br /> Total Direct Costs $3,236.29 <br />Indirect Costs <br />Current Division estimate is 19.88% of direct $643.37 <br />Total Required Bond $3,879.66 <br />