Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of Nalu ral Resources <br />1317 Sherman SL, Room 215 <br />Denver, Colorado 80207 <br />Phone: (3031 856-3567 <br />FAX: 13031 832-5 I Oh <br />DATE: February 21, 1996 <br />TO: Dan Mathews ~ {~ <br />FROM: Susan Burgmaier D"" <br />RE: Deserado Mine (C-81-018) <br />Minor Revision No. 101 <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy,Romer <br />Guvernor <br />lames S Lochhead <br />Eaeculive Direcbr <br />Michael B. Long <br />Division DneUOr <br />I reviewed the proposed sedimentation structures and access road, and have done a reclamation <br />cost estimate for MR 101. As such, I have the following comments: <br />Sediment Control <br />The operator's plan for sedimentation control is adequate, with one exception. The sump that <br />will contain runoff from the coal laydown area is shown with an emergency spillway at an <br />unknown elevation (appears to be lower than 5680). It is my understanding that this sump was <br />to be a total containment structure, with no discharge point. I talked to Dave Anderson, <br />Deserado Mine, and asked him to explain the plan. He said it was to be a total containment <br />structure, but that he believed an emergency spillway was required. As you and I discussed, if <br />the sump has a spillway, it would be required to be an NPDES permitted discharge point. <br />Considering that, I told Dave Anderson that he should either remove the spillway from the <br />proposed sump, or permit the sump as a discharging Qond. He plans to remove the spillway. <br />The new proposal should be for a sump that has no spillways, and provides at least .1 acre feet <br />of storage. If they modify the existing map (TS #2 Sediment Pond), the top of the berm should <br />be at or above 5681. The revised map should also include labelling of the contour lines, as the <br />last map did not. <br />Reclamation Cost Estimate <br />The attached pages provide details of the costs I estimated for reclamation of the proposed <br />structures and improvements. The total estimated cost is $3,879.66. <br />If you or the operator have questions, let me know. <br />c: Larry Routten <br />SLa\0?2196.WP <br />