My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L~ <br /> <br />' The topsoil shall generally consist of material stripped from the surface of <br />the disturbed areas as described in the Earthwork section of this <br />specification. The intention of this specification is to require the diligent <br />replacement of topsoil that has previously been stripped by the Contractor. <br />The Contractor will not be required to import topsoil from an outside <br />source. <br />3.3 FERTILIZER <br />A standard commercial fertilizer shall be uniformly broadcast over all <br />disturbed areas. The application rate shall be 100 lbs. per acre, or as <br />recommended by the manufacturer. The fertilizer shall be applied just prior <br />to commencement of seeding operations. <br />3.4 SEED <br />Seed shall be broadcast at a minimum rate of 30 lbs. per acre. <br />3.5 MULCH <br />Seeded areas shall be covered with mulch as soon as possible after <br />seeding. It shall be applied uniformly at the rate of 2 tons per acre. <br />Hydromulching of the disturbed areas with an approved <br />fertilizer/seed/mulch mix will be acceptable. <br />3.6 EROSION CONTROL MATS <br />3.6.1 Erosion control mats shall be applied to all cut and fill slopes <br />steeper than 1.5:1. <br />3.6.2 Staples shall be installed at a maximum spacing of 4 feet. <br />3.6.3 Mats shall overlap on the ends and sides at least 6 inches. <br />Q:\7333.15C\2003 update\SPECS\SPEC H.doc <br />SPEC. H -TOPSOIL SEEDING AND MULCHING <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.