My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6 BULK FILL <br />Bulk fill shall include soils, rock, rubble and other material with no physical <br />specification. <br />2.7 EM6EDMENT MATERIAL <br />Embedment Material shall be the envelope of aggregate or select fill around <br />the final location of pipes, including the individual layers variously called <br />bedding, haunching, initial backfill, and foundation. <br />2.8 FOUNDATION BEDDING <br />Foundation Bedding shall include placement of fill below structures and <br />concrete pads above the level of native soil or select fill upon which the <br />structures will be constructed. Foundation Bedding shall generally meet <br />the requirements described herein for Embedment Material. <br />2.9 ROCK EXCAVATION <br />Rock Excavation will be defined as the excavation of material that requires <br />more than two passes with Caterpillar D7 or larger Dozer equipped with a <br />single tooth Ripper or that cannot be removed with moderate effort using a <br />Caterpillar 235 Hydraulic Excavator equipped with a rock bucket (or <br />_ equivalent equipmentl. The Field Engineer, in consultation with the <br />r^ Contractor, will make the final determination. Blasting may be required to <br />remove bedrock materials. <br />2.10 ROADWAY SURFACING <br />Roadway surtacing material generally refers to aggregate material <br />processed on site for the purpose of stabilizing roadway surfaces. It can <br />consist of standard roadbase material or an alternate material that has <br />been used successfully under the conditions experienced at the mill site. <br />3 APPLICABLE STANDARDS <br />3.1 AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM) <br />ASTM C 33 Concrete Aggregates. <br />ASTM D 422 Grain Size Analysis of Soils. <br />ASTM D 425 Test Method for Centrifuge Moisture Equivalent of Soils. <br />SPEC. A -EARTHWORK <br />PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.