My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.2.8 BULK FILL <br />10.2.8.1 Bulk fill shall be placed in lifts to a minimum of 85 <br />percent of the maximum Standard Proctor density <br />as determined in accordance with ASTM D698. <br />The loose lift thickness shall generally not exceed <br />12 inches. <br />10.2.9 ROADBASE <br />10.2.9.1 Road base material shall be placed to a thickness <br />sufficient to result in a 6 inch thick compacted layer. <br />Road base material shall be compacted to a <br />minimum of 95 percent of the maximum Standard <br />Proctor density as determined in accordance with <br />ASTM D698 within 2 percent of the optimum mois- <br />ture content using a smooth drum vibratory soil <br />compactor. <br />10.2.10 ROADWAY SURFACING <br />10.2.10.1 Roadway Surfacing shall generally be placed to a <br />thickness determined in the field to provide <br />sufficient stabilization of roadway surfaces and <br />compacted as required. <br />10.2.11 BLENDED CLAY BARRIER/BACKFILL CONSTRUCTION <br />10.2.11.1 After preparation of the foundation is completed, a <br />zone of bentonite blended with select fill shall be <br />installed at the locations shown on the Drawings in <br />the following "Mixed Membrane Method" as pro- <br />posed by Wyo-Ben, Inc., or other procedure ap- <br />proved by the Engineer. <br />10.2.11.1.1 A layer of loose soil shall be placed into the <br />bottom and(or sides of the trench or ditch to <br />a depth of no greater than 6 inches. Mois- <br />ture should be sprinkled onto the soil until it <br />is near the optimum moisture content. The <br />soil may be loosened if necessary using a <br />rototiller to break up clods and agglomera- <br />tions. <br />SPEC. A -EARTHWORK <br />PAGE 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.