Laserfiche WebLink
6 <br /> 1 If eae took the picture to show that they were <br />• 2 removing from the stockpile at the time. <br /> 3 This topsoil stockpile--this is what I would <br /> 4 consider topsoil stockpile for the site. It is good enough <br /> 5 for this. It is from the site. It was somewhat revegetated, <br /> 6 since it's been there for a while. It's on the southern <br /> ~ edge of the pit. It was being, that day or recently--see the <br /> g cat tracks? It was actively being removed and presumably <br /> g taken from the site to be sold. <br /> 10 I think that's it for this group. <br /> 11 The removal from the topsoil stockpiles is <br /> 12 basically by reason for desiring to change the terms of the <br />• 13 Cease and Desist Order, because many times an operator--and <br /> 14 I am arguing over what indeed is topsoil for reclamation-- <br /> 15 he may say: Well, that's just fill dirt with rocks and I <br /> 16 can take it away and it isn't really useful for the <br /> 1~ reclamation. <br /> lg I may argue that it's basically all you've <br /> 19 got. without it, you've got some problems and you have to <br /> 20 strip it from the area in cahich you are working. <br /> 21 So my recommendation--and as soon as I get <br /> 22 done with my recommendation--I think we should probably <br /> 23 turn this over to Mr. Webster's representatives. <br /> 24 The staff recommends the civil penalty of <br /> <br /> 25 $500 a day for 20 days of operation for a total of $10,000, <br /> Fn ee ~• a Rrr:+ rcR s .a ~socr a re.r. 1 ~ c <br /> Crrd7~~'J J'hurrhunJ Rrpnn, r. <br /> /.500 Chrrr nJlr RuaJ <br /> Lu drmn. Cnlu rerln Fn l: l <br /> Ket-)6 /-A'R t <br />