My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10110
DRMS
>
Back File Migration
>
Revision
>
REV10110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:37 AM
Creation date
11/21/2007 10:09:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
12/23/1991
Doc Name
SOUTHFIELD MINE MR REQUEST 16 SOUTH FAN INSTALLATION
Type & Sequence
MR17
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southfield Mine <br />Minor Revision Request No. 16 <br />South Fan Installation <br />natural channel losses. Given these considerations and the limited <br />redisturbance associated with the proposed fan installation, this activity is not <br />expected to significantly impact surface or groundwater quality, quantity, use <br />or hydrologic balance. A detailed discussion of hydrology is presented in <br />Sections 2.04.5 and 2.04.6 of the EFCI permit application document (Volume <br />1). <br />SOILS, VEGETATION, FISH AND WILDLIFE, AND PRIME FARMLANDS <br />(2.04.8 THROUGH 2.04.21) <br />Refer to Sections 2.04.8, 9, 10, 11 and 12 of the EFCI permit application <br />document (Volume 1). <br />OPERATION AND RECLAMATION PLANS (2.05) <br />The proposed south fan installation will require surface disturbance of only 0.4 <br />acres and will involve very limited construction, operation, and maintenance <br />activities. Fan installation will involve the following sequential steps: <br />- Grade the existing light-use road and install drainage structures; <br />- Establish alternative drainage control; <br />- Clear and grade the fan installation site and establish a temporary <br />stockpile of excess cut material; <br />- Open the fan portal and stabilize surrounding highwall areas; <br />- Extend the existing powerline to the site; <br />- Stabilize mine entries and construct necessary seals; <br />- Construct and install foundation, fan housing, fan and associated <br />components. <br />12/2~/Dt fpm 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.