Laserfiche WebLink
Ms. Erica Crosby <br />July 29, 1996 <br />Page 2 <br />culvert removal costs for YB-4 and YB-5 have been deleted. An <br />additional 2400 feet of light-use road was also added from MR07 to <br />account for the roads to Topsoil Stockpile I and the substation. <br />The revised bond amount is $6,545 less than what the Division <br />currently holds. Seneca would prefer that this money be used to <br />cover any future revisions. <br />Enclosed are the required application form, proposed public notice, <br />insertion instructions into the PAP, and the revised materials. <br />Should you or any other members of the Division have any questions <br />regarding this information, please do not hesitate to contact me. <br />Sincerely, <br />~a,,,,y W . ~ /flati <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: John Husband (BLM) <br />• Larry Kline (GSMRE) <br />Gary Wendt (PWCC) <br />• <br />