Laserfiche WebLink
4. The Division has calculated a reclamation cost estimate for the disturbance <br />proposed in Technical Revision 57. The proposed disturbance will increase <br />OMLLC's liability by $25,769.00. This increase in liability will increase <br />OMLLC's overall liability to $3,858,032.00. The Division currently holds a <br />corporate surety in the amount of $3,912,042.00, for an excess in bond held of <br />$54,010.00. Based on the increase in liability calculated with Technical <br />Revision 57, OMLLC does not need to submit any additional bond monies at <br />this time. <br />This concludes the preliminary adequacy review for Technical Revision 57. Please call <br />me if you have any questions or concerns at (303) 866-4929. <br />Sincerely, <br />James R Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown <br />