My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09758
DRMS
>
Back File Migration
>
Revision
>
REV09758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:14 AM
Creation date
11/21/2007 10:07:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/14/1997
Doc Name
REVIEW OF ADEQUACY RESPONSES TO PERMIT REVISION 7 SYLVESTER GULCH FACILITIES AREA WEST ELK MINE
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Christine Johnston <br />Mountain Coal Company <br />Page 6 <br />April 14, 1997 <br />29. The Division has no further concerns. Subwatersheds 46C, 46D, 46E, 46F, 44B, 44C, <br />44D, 39C and 39D were correctly routed in the revised Sedcad designs, which were <br />submitted on Mazch 7, 1997. <br />30. The Division has no further concerns. The issue of the flow path concerning culvert <br />CSLY-5 is no longer a concern due to the elimination of that particular culvert in the <br />redesign of the drainage control system. <br />31. The Division has no further concerns. The routing diagram on Map 54B has been revised <br />to show the correct flow diagram for culverts CSLY-3 and CSLY-8 and ditch DSLY-8. <br />The revised Map 54B was submitted on Mazch 7, 1997. <br />32. The Division has no further concerns. MCC chose not to reference the ditch diagrams on <br />Drawing E611307A with the actual ditch numbers. However, Map 54B, Table 44E-1 and <br />Attachment 44E-1 have been revised to include the necessary ditch design data, thereby <br />eliminating the need to reference any other drawing. The revised information was in the <br />March 7, 1997 submittal. <br />33. The Division has no further concerns. The two pages of the Sedcad designs that were <br />missing have been included in the revised Sedcad designs, which were submitted on <br />March 7, 1997. <br />34. The Division has no further concerns. The peak flow in ditch DSLY-I and in culvert <br />CSLY-l, as presented in the March 7, 1997 Sedcad submittal, are acceptable. <br />35. The Division has no further concerns. The sideslopes of the emergency spillway were <br />correctly entered. <br />36. The Division has no further concerns. The pond SG-1 drawings now include a scale. New <br />Drawings E611304A and E611306A were submitted on March 7, 1997, and replace <br />drawing "Sediment Pond SG-1 Plan, Sections, and Details", that had been submitted on <br />November 1 S, 1996. <br />37. The Division was concerned that no anti-seep collars were in the designs for the pond SG- <br />1 primary spillway tube, as the tube passes through the pond embankment. MCC has <br />added a boot, for the primary discharge structure, onto the 60 mil HDPE liner of the pond <br />SG-1 design specifications. The revised design is shown on new drawing E611306A, <br />which was submitted on March 7, 1997. The Division recommends that anti-seep collars <br />still be installed on the discharge tube itself, as it passes through the embankment, as <br />
The URL can be used to link to this page
Your browser does not support the video tag.