My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09748
DRMS
>
Back File Migration
>
Revision
>
REV09748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:13 AM
Creation date
11/21/2007 10:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988037
IBM Index Class Name
Revision
Doc Date
2/22/1996
Doc Name
APPLICATION FOR SUCCESSION OF OPERATOR & APPLICATION TO AMEND REGULAR 112 OPERATION PERMIT
From
UNITED COMPANIES
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Indicated on the Mining Plan Map, a water storage pond is to be constructed to supply water for <br />aggregate washing. At the completion of mining operations, the fond wi~~land graded t <br />correspond with the adjacent area, and will be planted with grasses as specified. ~'^~~ ~ <br />It is expected that the entire site will be graded such that the floor of the mine, upon completion, will <br />have a less than 1% slope to the south west, or basically flat. The property does not have any irrigation <br />water, therefore a relatively flat grade will be less subject to erosion, and will consequently be more <br />prone to retain moisture . <br />The proposed final configuration of the mined area is compatible with surrounding areas in that <br />immediately adjacent to the north and south are similar rangeland uses. To the west, across county <br />road 44ZN are variations of pastures and rangelands. Also in the general area are several houses <br />situated on fairly large parcels of land. <br />It is expected that the duration of operations at the mine will be from 20 to 25 years. Final and <br />complete reclamation will be accomplished within 2 years of termination of mining activities. <br />It is the intention of the applicant that, as much as is possible, reclamation will be done concurrently <br />with the completion of mining in each mining phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.