Laserfiche WebLink
-~ <br />Mr. Rick Mills • • <br />' Page 2 <br />544,984 cyds needed <br />245.960 cyds stockpiled <br />299,024 cyds deficit <br />add borehole volumes stockpiled <br />-7750 cvds <br />291,274 cyds deficit <br />add projected waste pile deficit <br />+ 151.542 cyds <br />442,816 cyd deficit including completed waste pile needs <br />Permit C-82-056 refers to permit C-81-071 with regard to topsoil redistribution information. <br />However, information contained in permit C-81-071 is sketchy, poorly presented and much of it is <br />outdated. As noted above, Map 29 of the Foidel Creek permit is also not current. Prior to approval <br />of the permanent waste pile TCC needs to demonstrate that: <br />a) Current available stockpiled topsoil exists in amounts sufficient to cover the current <br />disturbance to previously approved depths. <br />bl Additional topsoil will be stripped from the footprint and imported from off-site to <br />cover the waste pile to a depth of 1.5 feet. <br />Therefore, the following information is required. <br />A map depicting all topsoil stockpiles for both C-82-056 and C-81-071. Please assign <br />names or numbers to each pile if not already done. <br />/ L~ A map showing all disturbed areas for both C-82-056 and C-81-071, breaking out acreages <br />\/ where necessary. Topsoil laydown depths should also be provided. These depths should <br />be based on a previously approved reclamation plan. Also, please provide permit page <br />reference when referring to existing information. <br />3. A chart indicating each pile, its current volume, and supporting calculations to verify <br />volumes li.e., survey data, etc.). This should be as a permit page. <br />4. Area 2 topsoil laydown data to support an average existing depth of 1 .5 feet. <br />DMG concern No. 6 -TCC response accepted. <br />It is apparent that once again we will need an extension of the proposed decision date. Please <br />forward a written request for an extension to a date which will allow at least 10 working days for <br />Division review. Please call me if you have questions. <br />Sincerely, <br />Kent Gorham <br />Reclamation Specialist <br />KG/yjb <br />cc: David Berry <br />m:\oss\yjb\mills <br />