Laserfiche WebLink
RECLAMATION COST SUMMARY ton['d <br />E. EARTHWORK - RIPPING <br />Task q~ ~ Taak Description ~ Cos[ (5) <br />22 ~ Rip upper bench at SA portal (rock crusher sv[el ~ 5'135 <br />27 ~ <br />_______ Rip <br />____ SA portal lover bench <br />________________________________________________ ~ 5931 <br />_____________ <br />Subtotal (E1: $1,666 <br />F. EARTHWORK - ROAD RECLAMATION <br />Task q~ Task Description ~ Cost (51 <br />______I_______________________________________________________________. <br />29 ~ Reclaim access road, haul to refuse area ~ $1,642 <br />______________________________________________________ I__________ <br />Subtotal (F1: 51.642 <br />sheeC 3 of 10 <br />