Laserfiche WebLink
RECLAMATION COST SUMMARY con['d <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task a Task Description I Cost (51 <br />______I____________________________________________________i____________ <br />I Highvalls to be backfill ed (incl. in Section A.1 I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />____-_~___________________________________________________ I <br />Subtotal (B): <br />C. EARTHWORK - WASTE/TAILINGS PILE CAPPING AND/OR COVER PLACEMENT <br />Task al <br />______I Task <br />_______________________ Description <br />_____________________________I Cost I$) <br />____________ <br />17 Push portal 9 coal stockpile into refuse area 54,'!50 <br />18 Cover portal 9 refuse pile with material in berm 5323,225 <br />19 Dist rihute subsoil on refuse area 519,929 <br />20 Haul s spread subsoil from a9 berm to refuse area I 525,012 <br />DI <br /> <br />I <br />I <br />I <br />I <br />_______ <br /> <br /> <br /> <br /> <br /> <br />______________________ I <br />I <br />I <br />I <br />I <br />I <br />______________________________ <br /> <br /> <br /> <br /> <br /> <br />___________ <br />Subtotal (C1: 53'11,916 <br />D. EARTHWORK - FILL COMPACTION <br />Task pl Task Description Cost ($1 <br />______I____________________________________________________I____________ <br />74 Compact portal 9 coal stockpile material at refuse $1,168 <br />I I <br />Portal 5 stockpile compaction included in Task 30 I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />------------------------------------------------------------------------ <br />Subtotal (D): 51.168 <br />sheet 2 of 10 <br />