Laserfiche WebLink
azea. Once the slurry wall is installed, mining will begin and the water trapped in the sealed azea will be dischazged. <br />The gravel deposit removed will be temporarily stockpiled in the Buff Lake azea and transported to the gravel <br />processing plant located on site. <br />The remaining lakes will be "wet" mined with a dredge and reclaimed to goundwater-exposed lakes as previously <br />approved. In addition, all terms and conditions of the initial permit will remain in force. The postmining land use <br />for the unlined lakes will not change from the initial permit approval and will consist of a combination of recreation <br />and wildlife habitat. <br />I. Objections: <br />The Division received objecfions from the following individuals and organizations during the initial public comment <br />period. <br />Objector Dated Date Received <br />Duke Energy June 30, 4004 July 2, 2004 <br />Kathryn Hazdin July 11, 2004 July 13, 2004 <br />Michael J. Ptasnik July 12, 2004 July 13, 2004 <br />Bruce Rippe July 13, 2004 July 14, 2004 <br />Stanley Odenbaugh July 13, 2004 <br />Kristi Plutt July 13, 2004 July 14, 2004 <br />The Town of Milliken July 14, 2004 July 14, 2001 <br />Objections Received after the Public Comment Period: <br />Objector Dated Received <br />Division of Wildlife August 5, 2004 August 11, 2004 <br />Objections Withdrawn to Date: <br />Objector Dated Received <br />None <br />The following Objectors became Parties by having representation at the Pre-hearing Conference held at <br />1313 Sherman Street, Rm. 318, Denver, CO 80203 on August 2, 2004 at 10:00 AM: <br />Platte Sand & Gravel LLC. (Applicant) <br />Steve O'Brian (Environment Inc. consultant for the Applicant) <br />Bruce Rippe <br />2 <br />