Laserfiche WebLink
C-PIT Hydrogeologic Investigations <br />Technical Revision No. 8 <br />2: Site Analysis and Field Activities Mining Permit M-1977-208 <br />' Monitoring wells CEM-001 (previously installed by others), CEM-002, and CEM-003 were geophysicapy <br />logged using induced gamma-ray and formation resistivity after completion of the wells. Copies of the logs <br />are in Appendix D. <br />' Figures 3, 4 and 5 depict three cross sections taken through the C-Pit area, oriented as indicated on Figure 2. <br />These sections display the geology m and around the C-Pit site, based upon interpreting the information <br />obtained during the drilling program, aerial photography and the mining Mstory of the site. As shown on <br />1 Figure 5 (Section C-C~, two additional bore holes were made at the haul road intersection immediately <br />northeast of C-Pit to determine the depth to bedrock in this area. The drilling indicated that a block of <br />residual bedrock (Smokey Hill Shale) separates the water in C-Pit from the St. Vrain Creek alluvial system to <br />the north. <br />2.5 Compliance Well CEM-005 <br />Compliance Well CEM-005 was located after consultation with DRMS at a February 22, 2007 meeting at the <br />CEMEX Plant CEM-005 was designed to monitor the Fort Hays Limestone unit approximately 2,700 feet <br />southeast (down-dip) of monitoring well CEM-001. Figure 2 shows the location of CEM-005 relative to <br />C-Pit and the monitoring well network established around C-Pit. <br />CEM-005 is a 4-inch well with PVC casing, drilled to a total depth of 401 feet below ground surface (bgs) on <br />May 14 and 15, 2007. Prior to setting the screen and casing, the open borehole was geophysically logged <br />using induced gamma-ray and formation resistivity to determine the elevations of the contacts between the <br />Fort Hays Limestone, the Smoky Hill Shale above the Fort Hays, and the Carlile Shale unit below. The <br />10-foot screen was set from 388 to 398 feet bgs and sand packed with 10-20 washed silica sand to 378 feet <br />bgs. The annulus above the sand pack was grouted with bentonite grout from 378 feet bgs to the ground <br />surface. Together, the screen and sand pack monitor the Fort Hays Limestone at the approximate elevations <br />4836 to 4816 feet amsl (378 to 398 feet bgs) at this location. <br />Figure 9 shows the well construction details and lithology of CEM-005. <br />CEM-005 was first sampled on May 22, 2007, after the well had been completed, grouted, and developed five <br />days previously. Prior to obtaining the sample, the water in the well was removed by the driller through <br />bailing with a 4-inch bailer, from an initial level at approximately 20 feet bgs down to 390 feet bgs, at which <br />time the water level was allowed to recover to 389.75 feet bgs over the course of one hour. Prior to sampling, <br />the well was bailed again and was allowed to recover for another hour before collecting a final baier volume <br />for the sample. The analytical results are summarized on Table 2. <br />CEMEX personnel gauged the depth to water at CEM-005 on June 19, 2007 and determined the water level <br />was 394.85 feet below the top of casing (btoc), ox elevation 4822.38 amsl, confirming that very little recharge <br />had occurred since the initial sampling of May 22, 2007. The water elevation in C-Pit and potentiometric <br />head elevation at well CEM-001 on June 15, 2007 were approximately 5211 and 5213 amsl, respectively. <br />On July 3, 2007, Brown and Caldwell personnel returned to CEM-005 and determined the water level was <br />394.32 feet btoc, or elevation 4822.91 amsl. The water level was lowered to 395.99 feet btoc by hand bailing, <br />and after approximately three hours only 0.03 feet of recovery in the water level was noted. On July 1Q 2007, <br />' Brown and Caldwell personnel returned and measured the depth to water in CEM-005 to be 395.69 feet <br />below the top of casing, or elevation 4821.54 amsl. <br /> <br />1 <br />2.9 <br />Use of contains on tMS sheet is suhlect to the hmrtanons speeded althe entl of this document. <br />\\BCDEN02\prolects\DataWENlGemex\TR-8\Reporting~CEMEX Report OB-31-07.dw <br />