My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09405
DRMS
>
Back File Migration
>
Revision
>
REV09405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:54 AM
Creation date
11/21/2007 10:03:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/20/1996
Doc Name
TR 39 DESERADO MINE C-81-018
From
WESTERN FUELS UTAH INC
To
DMG
Type & Sequence
TR39
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;, . <br />PAGE TWO <br />AUGUST 20, 1996 <br />DAN MATHEWS <br />6. Page IV-25 has been revised. References to Map 81 and Map 95 have been replaced by i <br />Map 77 and Map 63, respectively. <br />7. AS per Dave Anderson who ran SEDCAD calculations, the as-buiR RP-5 Pond is correct. The <br />spillway is a two level spillway as shown. There is no 3-inch trickle tube for dewatering. The <br />trickle tube is a'work around' from SEDCAD which allows the calculation for the pond solution <br />to begin with an empty basin. The pond will be kept 2.5 feet below the primary spillway by <br />pumping the pond water after a major event. Such pumping will take place soon after the <br />weather and ground conditions permit. Page IV-43 has been revised to include this language. <br />8. Page V-42 and Page V-44 have been revised as per your suggestion. Forbes and shrubs <br />will not be seeded in the ditch channels. However, they will be added at one pound PLS per ~ <br />acre for other stabilization planting. The planting Ueatment (3) will use 13 pounds PLS per <br />saes drilled and 26 pounds PLS per sae broadcast seeding as per Table V-14, page V-44. <br />I trust this letter satisfies your concerns. I have added Page IV-25A (a new page) to include the ,~ <br />Implementation schedule for the work to be done in the refuse area. If you have further questions, <br />please let me know. I have included three copies of the revised pages (IV-24, IV-25, IV-25A, IV-43, <br />V-42 and V-44) and Map 77 for your files. The following documents have been submitted previously: <br />• Table of Contents for IIIusVation 44 (for replacement) <br />• SEDCAD runs (for insertion at the end of Illustration 44) ~ <br />• Page IV-24A (Figure IV-1) -new page ~ / <br />• Page IV-24B (Figure IV-2) -new page <br />• Pabe IV-42 for replacement <br />• Map 76 for replacement <br />~Sin~c~er~ey~, t <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />oc: Raja Upadhyay <br />Jeff Dubbert <br />BLM-Meeker <br />
The URL can be used to link to this page
Your browser does not support the video tag.