Laserfiche WebLink
6 <br /> 1 The total operation, Z think that we are <br />• Z talking about here is--if I have the figures right--the man <br /> 3 who operates the quarry for them--I think the whole operation <br /> 4 yields less than $8 to $10,000 a year. <br /> 5 That would be my hope and if you want to <br /> 6 consider that before I present testimony; or if you want me <br /> ~ to present testimony, we can proceed. <br /> g THE CHAIRMAN: Well, I would maybe just give <br /> g a bit of response to that. From my standpoint, as serving <br /> 10 on the Board here, the response is almost a recorded response <br /> 11 after five years of hearing this kind of thing. <br /> 12 We have got some operators still in the state <br />• 13 who are not permitted and we are trying our best. After <br /> 14 five years on this board, we are still trying to get everybody <br /> 15 permitted. <br /> 16 What you are talking about is granting the <br /> 17 continuance here. It is a futile continuance after five <br /> lfi years. <br /> 19 We have got to draw the lines somecahere. We <br /> ZO have worked very, very hard in our first years--three to four <br /> 21 years particularly--as a board to bend over backwards and <br /> 22 not da this type of thing, this proposed type of thing to <br /> z3 operators who were not even permitted or whether or not they <br /> 24 were in violation of a permit. Those caho were not even <br />• <br /> 25 permitted, we bent over backwards. We went to a compliance <br /> E/L EEA' ( -I RPE.~TF.R R rLSS O C/.l iF S. ! eC. <br /> Cnrilnl Shun hnnJ Rrryvn-.~ <br /> 1500 ("hrr. rrJle Road <br /> Lurlrrt.n. CuluroJn ,vlrCl <br /> J2l J61-3?AJ <br />